使用冷再生機路面平整工作是如何進行的?
來源:http://www.baitaiglass.com/ 日期:2021-10-15 發布人:
冷再是技術已經是道路施工中較為常見的一種機器了,在使用冷再生機后的路面平整工作該如何進行呢?
Cold recycling technology is already a common machine in road construction. How to carry out the pavement leveling after using cold recycling technology?
壓路機對再生層穩壓后,再生材料基本能夠處于穩定狀態,但仍不能完全消除再生機的輪跡,此時的輪跡深度約為0.5~1cm。
After the roller stabilizes the recycled layer, the recycled material can basically be in a stable state, but the wheel trace of the regenerator can not be completely eliminated. At this time, the wheel trace depth is about 0.5 ~ 1cm.
當完成兩幅再生并全部穩壓后,用平地機進行整平,一遍整平的目的是消除一幅、二幅右側共三排輪跡。二遍整平主要是為了把刮刀前的再生料均勻地攤開,同時兼顧再生層的橫向、縱向的坡度。再進行全作業段的找平。
After the regeneration of two frames is completed and all of them are stabilized, level them with a grader. The purpose of one leveling is to eliminate three rows of wheel tracks on the right side of one and two frames. The second leveling is mainly to spread the recycled material in front of the scraper evenly, and take into account the transverse and longitudinal slopes of the recycled layer. Then level the whole operation section.


冷再生機出租
Rental of cold regenerator
平地機對再生層找平后,如仍存在輪跡、麻面、局部骨料集中等現象,則需人工進行修補。方法是用再生新料將輪跡、麻面填滿,所用新料應高出再生層0.5cm;將集中的骨料撒開,并用新料填充骨料的縫隙。
After leveling the reclaimed layer with grader, if there are still wheel marks, pitted surface, local aggregate concentration and other phenomena, it shall be repaired manually. The method is to fill the wheel trace and pitted surface with recycled new material, which shall be 0.5cm higher than the recycled layer; Scatter the concentrated aggregate and fill the gap of aggregate with new material.
下一篇:冷再生機在公路養護中的應用! 上一篇:平地機出租整機保養檢查工作!
推薦閱讀/ Recommended reading
- 水泥撒布車出租是路面基層施工的“合理鋪灰神器” 2026-07-05
- 租賃冷再生機哪幾點要注意? 2026-07-07
- 冷再生機租賃從設備選型到驗收避坑,一篇講透 2026-07-09
- 水泥撒布車租賃市場洞察與科學選型指南 2026-06-29
冷再生機租賃時核心關注這四大核心指標
[2026-07-11]
第一,撒布精度——這是水泥撒布車的“生命線”。 租賃粉料撒布車時,核心要看控制系統是否具備自動恒速撒布功能——即車輛行駛速度變化時,撒布量依然保持恒定。現代智能化撒布車以進口車載...